Skip to content
DEEP WELL SAMUI

Borehole Drilling & Installation on Koh Samui

For construction firms, developers and owners with a drilled hole that was never finished. We complete boreholes properly: casing, wellhead, sanitary sealing and yield testing.

Book a Free Site SurveyFree site survey
20+ yrs
service life of a properly cased borehole
4–6"
standard casing diameters
1–3 days
typical completion time

Transparent pricing

Honest starting prices — and a fixed written quote before any work begins.

What determines your price

No two sites on the islands are the same. Your final price depends on:

  • Bore depth and condition — completing an existing hole starts with an inspection
  • Casing specification — material and diameter sized to the well
  • Site access — equipment reach at the wellhead

Complete borehole installation

Priced per site — free survey & written quote.

We also inspect and complete boreholes drilled by others.

What's included

  • Casing and wellhead completion
  • Sanitary sealing against surface contamination
  • Yield and recovery testing

Priced separately

  • Drilling of a new bore (see deep well drilling)
  • Pump system

Final fixed price confirmed after a free site survey.

Final price depends on site inspection, distance, access, depth, soil/rock conditions, equipment, required materials, water volume, and urgency.

You'll get a written fixed quote after the survey — the price we quote is the price you pay.

What's included

  • Condition inspection (for existing bores)
  • Casing supply and installation
  • Wellhead completion with a clean concrete pad
  • Sanitary sealing
  • Yield testing with a written report

How it works

  1. Inspection

    For an existing bore we run a condition and depth check first — you get an honest verdict on whether it's worth completing.

  2. Casing

    The bore is cased to spec. Casing is what separates a borehole that lasts twenty years from one that silts up in two.

  3. Sealing & wellhead

    Sanitary sealing keeps surface runoff out of your groundwater; the wellhead is finished with a tidy pad, ready for a pump.

  4. Yield testing

    We measure flow and recovery and document both, so any pump installer — us or anyone else — can size equipment correctly.

Specs & typical figures

Casing material
uPVC or steel
Diameters
4–6 inch
Sealing
Bentonite/cement sanitary seal
Documentation
Written yield & depth report

Who it's for

  • Construction firms

    Completion to spec with the documentation your project file needs.

  • Owners of unfinished bores

    Inspection first, then an honest quote to finish someone else's drilling.

  • Developers

    Boreholes delivered ready for pump systems, on the build schedule.

Common questions

Need water on Samui, Phangan or Tao?

Talk to us today — free site survey, written quote, no obligation.

Get a Free QuoteFree site surveyWe reply within 2 hours
CallWhatsAppLINE