Skip to content
DEEP WELL SAMUI

Complete Water Systems for Villas, Hotels & Construction

For hotels, resorts, developers and owners building new. We design the whole chain — source, storage, pressure, treatment — as one engineered system, then build and maintain it.

Book a Free ConsultationFree site survey
0.3–0.5 m³
typical daily use per villa guest
1 system
well + pump + storage + filtration
3
islands covered

Transparent pricing

Honest starting prices — and a fixed written quote before any work begins.

What determines your price

No two sites on the islands are the same. Your final price depends on:

  • Water volume required — a villa and a resort are different projects
  • Depth to water — drives the source side of the system
  • Equipment specification — pumps, storage and filtration sized together
  • Site access — construction-phase logistics

System design & build

Priced per site — free survey & written quote.

Quoted per project after a free consultation — every system is engineered to the property.

What's included

  • Capacity planning from real consumption
  • Full system design (source to tap)
  • Coordination with your architect or PM

Priced separately

  • Civil works beyond the water system

Final fixed price confirmed after a free site survey.

Final price depends on site inspection, distance, access, depth, soil/rock conditions, equipment, required materials, water volume, and urgency.

You'll get a written fixed quote after the survey — the price we quote is the price you pay.

What's included

  • Consumption-based capacity planning
  • Source design: well or delivery-fed
  • Pressure and distribution design
  • Storage and filtration sizing
  • Construction-phase water bridging by truck
  • Maintenance handover with documentation

How it works

  1. Consultation

    We take your plans and occupancy numbers and calculate real demand — with the rules of thumb shown, not hidden.

  2. Design

    One system: source, storage, pressure, treatment. You get specs and drawings your architect or PM can work with.

  3. Build

    Drilling, tanks, pumps and filtration installed in the right order for your build schedule; truck delivery bridges the construction phase.

  4. Handover & maintain

    Documented handover, staff walkthrough, and a maintenance contract if you want the system to stay someone else's problem.

Specs & typical figures

Capacity basis
0.3–0.5 m³/guest/day
Scope
source → storage → pressure → treatment
Coordination
architects · PMs · contractors
Documentation
specs, drawings, handover file

Who it's for

  • Hotels & resorts

    Capacity engineered around occupancy, with maintenance contracts and one point of contact.

  • Developers & construction

    Specs, drawings and timelines that slot into your project plan — plus site water during the build.

  • Owners building new

    The water system designed before the walls go up, not retrofitted after.

Common questions

Need water on Samui, Phangan or Tao?

Talk to us today — free site survey, written quote, no obligation.

Get a Free QuoteFree site surveyWe reply within 2 hours
CallWhatsAppLINE